How ISC Constructors brought safety, quality, and speed together with Inncircles
The background
With over 30 years in the industry, ISC Constructors is a trusted subcontractor for high-stakes industrial and energy projects. ISC brings deep expertise in MEP, instrumentation, and electrical installations across complex, multi-stakeholder environments, from data centers and hydrogen facilities to chemical parks.

Type: Sub contractor
Years in industry: 30+
Modules subscribed: 6
The
impact
90,000
work units tagged and monitored
4200+
quality folders and packages structured
4 hours
average response time achieved

Challenge
ISC was managing parallel execution across multiple fast-track industrial sites from the Amazon Data Center to Shell's Chemicals Park, where manual forms, safety logs, and version control created bottlenecks. With thousands of tags, forms, and inspections, teams struggled to maintain traceability, compliance, and custom workflows suited to each project's demands.

Solution
Here is how Inncircles stepped in to resolve the subcontractor's challenges -
1
Providing superior quality and safety management
The subcontractor could digitize quality control checklists and punch lists and create custom inspection forms. This enabled conducting direct inspections from the field using mobile devices, capturing photos, adding notes, and instantly assigning corrective actions. Contractors' and subcontractors' work was reviewed, tracked, and approved with automated certifications. Every safety requirement was tracked with integrated logs and calendars. Overall, safety compliance was elevated by 45%.
2
Aiding successful digital transformation
Inncircles' CMS is so user-friendly that the subcontractor's team could hit the ground running from day 1 after setting up.
3
Enhancing project management
Detailed Work Breakdown Structures (WBS) helped build comprehensive schedules and allocate resources strategically. All the project agreements were accessible and organized in a centralized repository, and contract creation was automated with user-friendly templates.
4
Streamlining workflows
Accountability was boosted by allocating field teams to specific work packages, setting timelines, and syncing schedules directly with industry-leading tools like Oracle's Primavera P6 and Microsoft Project. Finally, bottlenecks were minimized through sequential or parallel approval workflows.
5
Enabling strategic growth
Rich reports generated with automatically collected data gave the subcontractor a clear picture of the project's costs, performance, and timelines, enhancing the project milestone visibility by 34%.
Transformation through Inncircles
Quality Forms Configured
100+
Average Response Time
4 Hrs
Custom Features
35
No. of Safety Forms Configured
152
No. of Tags Created
90,000
Configuration Requests
42
Quality Folders & Packages
4200